• Skip to content
  • Skip to navigation
Print header
X

  • (07) 4970 0700
  • Online Services

«Back to
Gladstone Regional Council

Version 2 - Current Planning Scheme

  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment benchmarks
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Regulated requirements
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary
    • ​4.2 Planning assumptions Open
        Back​4.2 Planning assumptions
      • 4.2.1 Purpose
      • ​​4.2.2 Population and employment growth
      • ​4.2.3 Priority infrastructure area
      • ​​4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Categories of development and assessment
    • 5.4 Regulated categories of development and categories of assessment prescribed by the Regulation
    • 5.5 Categories of development and assessment—Material change of use Open
        Back5.5 Categories of development and assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Categories of development and assessment: Reconfiguring a lot
    • 5.7 Categories of development and assessment: Building work
    • 5.8 Categories of development and assessment: Operational work
    • 5.9 Categories of development and assessment: Local plans
    • 5.10 Categories of development and assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low–medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Development that cannot be made assessable in accordance with Schedule 6 of the Planning Regulation 2017
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Advertising devices
      • 9.3.2 Development design
      • 9.3.3 Extractive industry
      • 9.3.4 Home based business
      • 9.3.5 Landscaping
      • 9.3.6 Operational works
      • 9.3.7 Reconfiguring a lot
      • 9.3.8 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps​
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Planning Act 2016
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Plans of development
    • SC6.4​ Community and economic needs assessment
    • SC6.5​ CBD redevelopment
    • SC6.6​ Beecher/Burua constant flow precinct
    • SC6.7 Flood hazard
    • SC6.8 Heritage
    • SC6.9 Non–resident workers accommodation
    • SC6.10 Vehicle parking rates
    • SC6.11 Waste management
  • Appendices
Version 2 - Current Planning Scheme
  1. Home
  2. Version 2 - Current Planning Scheme
  3. Part 6 Zones
  4. 6.2 Zone codes
  5. 6.2.19 Emerging community
Back
Online Mapping

6.2.19 Emerging community

6.2.19.1 Application

This code applies to development where the code is identified as applicable in a table of assessment.

When using this code, reference should be made to section 5.3.2 and where applicable, section 5.3.3 located in Part 5.

6.2.19.2 Purpose

  1. The purpose of the emerging community zone code is to:
    1. Identify and conserve land that may be suitable for urban development in the future.
    2. Manage the timely conversion of non–urban land to urban purposes when needed to meet community needs.
    3. Development for the purpose of new urban communities is undertaken only where there is overriding community and economic need and in accordance with a Plan of development.
      Note—Future urban development must be provided with a Plan of development in accordance with the Plan of development planning scheme policy and a Community and economic needs assessment in accordance with the Community and economic needs assessment planning scheme policy.
    4. Prevent or discourage development that is likely to compromise appropriate longer term use.
  2. The purpose of the zone will be achieved through the following overall outcomes:
    1. Development of land that is considered generally suitable for urban purposes only occurs after detailed planning studies have been undertaken to identify scenic, environmental and infrastructure constraints and opportunities.
    2. Interim development does not compromise the future development potential of the area for urban purposes and uses that are incompatible with residential uses are not encouraged.
    3. Development is based upon the efficient provision of infrastructure, consideration of environmental constraints and desired settlement pattern for the area.
    4. Significant historical, architectural, topographic, landscape, scenic, social, recreational and cultural features and associations, as well as natural habitat areas, wildlife corridors, wetlands and waterway corridors are protected and enhanced.
    5. Proposed roads and other transport corridors are coordinated and interconnected to ensure pedestrian, bike, public transport and private vehicles have accessibility between neighbourhoods, centres and other locations.
    6. Development responds to land constraints, including but not limited to topography, bushfire and flooding.

6.2.19.3 Assessment benchmarks

Table 6.2.19.3.1—Accepted development subject to requirements and assessable development

Performance outcomes Acceptable outcomes

Use – Caretaker's accommodation ​

PO1

Development:

  1. does not compromise the future urban use of the site, and
  2. provides adequate open space for the caretaker.
​

AO1.1

No more than 1 caretaker's accommodation unit is established on the site.

AO1.2

The caretaker's accommodation unit is a maximum of 100m2 GFA.

Use – Sales office ​

PO2

The use does not adversely impact on the amenity of the surrounding land uses and local character.

AO2.1

Development of the sales office is in place for no more than two years.

AO2.2

The site coverage of the building is a maximum of 50% of the site area.

AO2.3

There are a maximum of 2 employees on site at any one time.

AO2.4

The use operates between 9am and 6pm Monday to Saturday and 9am to 1pm on Sunday.

Building height ​(if involving building work)

PO3

Buildings :

  1. are low rise
  2. do not create overshadowing on adjoining residential properties, and
  3. do not adversely impact on the character and amenity of the area.

AO3

Building height does not exceed 8.5m.

Residential density

PO4

Development reflects the low density character of the area.

AO4.1

Residential density is limited to:

  1. one dwelling house per allotment (including one secondary dwelling).

AO4.2

Where a dwelling house, any secondary dwelling is:

  1. a maximum of 80m2 GFA
  2. located within 50m of the main building
  3. linked to the main building by a defined footpath in the most direct route possible.
For all assessable development ​

Land use ​

PO5

Interim non–urban development does not reduce or preclude the long–term use of the site or nearby land for urban purposes, having regard to the scale and nature of the activity and its likely impacts.

No acceptable outcome is nominated.

​PO6

New urban communities are established whereby:

  1. there is an overriding community and economic need; and
  2. development is supported by a Plan of development.

​AO6.1

Development is provided with a Community and economic needs assessment in accordance with the Community and economic needs assessment planning scheme policy.

​AO6.2

Development is provided with a Plan of development in accordance with the Plans of development planning scheme policy.

Effects of development ​

PO7

Development responds sensitively to on–site and surrounding topography, drainage patterns, utility services, access, vegetation and adjoining land use, such that:

  1. any hazards to people or property are avoided
  2. any earthworks are minimised
  3. the retention of natural drainage lines is maximised
  4. the retention of existing vegetation is maximised
  5. damage or disruption to sewerage, stormwater and water infrastructure is avoided, and
  6. there is adequate buffering, screening or separation to adjoining development.
No acceptable outcome is nominated.

PO8

Development maintains a high level of amenity within the site and minimises impacts on surrounding areas, having regard to:

  1. noise
  2. traffic and parking
  3. visual impact
  4. signage
  5. odour and emissions, and
  6. lighting.

Note—Applicants may be required to engage specialists to provide detailed investigations into the above matters in order to demonstrate compliance with this performance criterion.

No acceptable outcome is nominated.

PO9

Development is to:

  1. minimise noise dust, odour or other nuisance from existing lawful uses including adjoining industrial uses
  2. minimise nuisance caused by noise, vibration and dust emissions generated by the state–controlled road and rail network in the vicinity of land in the low density residential zone.
No acceptable outcome is nominated.

Use – Outdoor sport and recreation ​

PO10

All buildings must:

  1. be associated with the Outdoor sport and recreation activity, and
  2. low in scale and density.
No acceptable outcome is nominated.

PO11

Development provides adequate separation, screening and buffering from any adjoining residential premises or residential zone so that residential privacy and amenity is not adversely affected.

​AO11.1

Development that shares a boundary with a residential premises or residential zone requires a minimum boundary setback of 6m for:

  1. active outdoor use or sporting areas
  2. site access points
  3. car parking areas, and
  4. servicing or outdoor storage areas.

AO11.2

Development that shares a boundary with a residential premises or residential zone must ensure all buildings:

  1. are setback a minimum of 15m from that common boundary, and
  2. include a minimum 1.8m high solid screen fence along that common boundary, or
  3. a landscaped buffer area consisting of dense screen planting of a minimum 3m width along that common boundary.

Note—Refer also to the Landscape code.

PO12

Outdoor lighting does not adversely affect the amenity of adjoining properties or create a traffic hazard on adjacent roads.

AO12.1

Light emanating from any source complies with Australian Standard AS4282 Control of the Obtrusive Effects of Outdoor Lighting as amended.

AO12.2

Outdoor lighting is provided in accordance with Australian Standard AS1158.1.1 – Road Lighting – Vehicular Traffic (Category V) Lighting – Performance and Installation Design Requirements as amended.

Online Mapping

Version 2 - Current Planning Scheme

SELECT
  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment benchmarks
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Regulated requirements
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary
    • ​4.2 Planning assumptions Open
        Back​4.2 Planning assumptions
      • 4.2.1 Purpose
      • ​​4.2.2 Population and employment growth
      • ​4.2.3 Priority infrastructure area
      • ​​4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Categories of development and assessment
    • 5.4 Regulated categories of development and categories of assessment prescribed by the Regulation
    • 5.5 Categories of development and assessment—Material change of use Open
        Back5.5 Categories of development and assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Categories of development and assessment: Reconfiguring a lot
    • 5.7 Categories of development and assessment: Building work
    • 5.8 Categories of development and assessment: Operational work
    • 5.9 Categories of development and assessment: Local plans
    • 5.10 Categories of development and assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low–medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Development that cannot be made assessable in accordance with Schedule 6 of the Planning Regulation 2017
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Advertising devices
      • 9.3.2 Development design
      • 9.3.3 Extractive industry
      • 9.3.4 Home based business
      • 9.3.5 Landscaping
      • 9.3.6 Operational works
      • 9.3.7 Reconfiguring a lot
      • 9.3.8 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps​
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Planning Act 2016
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Plans of development
    • SC6.4​ Community and economic needs assessment
    • SC6.5​ CBD redevelopment
    • SC6.6​ Beecher/Burua constant flow precinct
    • SC6.7 Flood hazard
    • SC6.8 Heritage
    • SC6.9 Non–resident workers accommodation
    • SC6.10 Vehicle parking rates
    • SC6.11 Waste management
  • Appendices

Gladstone Regional Council

Connect. Innovate. Diversify.

Return to top

Get in Touch

Phone

(07) 4970 0700

Opening Hours

8.30am - 5pm Monday to Friday

Social media

Contact Us  Email Us

Postal Address

PO Box 29, Gladstone Qld 4680

Council Offices

101 Goondoon Street, Gladstone Qld 4680
3 Don Cameron Drive, Calliope Qld 4680
41 Blomfield Street, Miriam Vale Qld 4677
Cnr Wyndham & Hayes Avenues, Boyne Island Qld 4680

Rural Transaction Centres

71 Springs Road, Agnes Water Qld 4677
47 Raglan Street, Mount Larcom Qld 4695

Footer Image Links

Gladstone Regional Council Logor Gladstone Entertainment Convention Centre Logo Gladstone Regional Art Gallery and Museum Logo Gladstone Regional Libraries Logo Gladstone Tondoon Botanic Gardens Logo Philip Street Communities and Families Precinct

Footer Acknowledgement

Gladstone Regional Council would like to acknowledge the Bailai, the Gurang, the Gooreng Gooreng and the Taribelang Bunda people who are the traditional custodians of this land. Gladstone Regional Council would also like to pay respect to Elders both past, present and emerging, and extend that respect to other Aboriginal and Torres Strait Islander people. Learn more about Council's Reconciliation Action Plan (RAP).

Chat Popup

Launch Chat

© 2025 Gladstone Regional Council

All content © Gladstone Regional Council Planning Scheme. All Rights Reserved.

Powered by Jadu Central.

  • Privacy
  • Right to Information
  • Login
Back to the top
Print footer