• Skip to content
  • Skip to navigation
Print header
X

  • (07) 4970 0700
  • Online Services

«Back to
Gladstone Regional Council

Version 1 - Superseded Planning Scheme

  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions Open
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments
Version 1 - Superseded Planning Scheme
  1. Home
  2. Version 1 - Superseded Planning Scheme
  3. Part 9 Development codes
  4. 9.2 Statewide codes
Back
Online Mapping

9.2 Statewide codes

9.2.1 Community residence

  1. The purpose of the community residence code is for assessing a material change of use for a community residence.

Table 9.2.1.1—Community residence for self–assessable development only

Acceptable outcomes (AO)
AO1 The maximum number of residents is seven.
AO2 One support worker is permitted to reside on the premises at any time.
AO3 The maximum number of support workers attending any daytime activity shall not exceed seven people over a 24 hour period.
AO4 Resident and visitor parking is provided on site for a minimum of two vehicles. One vehicle space must be dedicated for parking for support services.

 

9.2.2 Forestry for wood production

9.2.2.1 Application

This code applies to assessing a material change of use for development involving cropping (where involving forestry for wood production) in the rural zone.

9.2.2.2 Purpose

  1. The purpose of the code is to ensure forestry for wood production is assessed with equal regard to other forms of cropping, to guarantee long–term harvest and minimise impacts.
  2. The purpose of the code will be achieved through the following overall outcomes:
    1. the use is appropriately located and setback from areas of environmental interest and existing infrastructure
    2. the impacts on adjoining land uses are minimised
    3. the risk of fire is minimised
    4. expected harvest cycles, volumes, timescales and haulage routes, plus proposed wildfire management and the location of supportive infrastructure are known by the local government, where development is assessable.

9.2.2.3 Criteria for assessment

Table 9.2.2.3.1—Self–assessable and assessable development

Performance outcomes Acceptable outcomes
For self–assessable and assessable development ​
Setbacks

PO1

The establishment of the forest for wood production is located to minimise impacts (such as shading and falling trees) on infrastructure and areas of environmental interest.

AO1.1

The establishment of the forest for wood production is setback from existing infrastructure and areas of environmental interest in accordance with Table 9.2.2.3.2—Forestry for wood production setback distances.

AO1.2

No cultivation and planting for wood production is to occur in the setback areas identified in Table 9.2.2.3.2. Road and track establishment and maintenance can occur.

AO1.3

Self–propagated seedlings (wildlings) generated from the forest for wood production are eradicated from the setback areas identified in Table 9.2.2.3.2.

Impacts on soil structure, fertility and stability

PO2

The impacts of the forest for wood production on soil structure, fertility and stability are minimised through appropriate management of the site.

AO2.1

The establishment and maintenance (including associated tracks and roads) of the forest for wood production utilises one or more of the following methods:

  1. mechanical strip cultivation on the contour, spot cultivation or manual cultivation is used for establishment on slopes greater than 10% and less than 25%
  2. either spot cultivation or manual cultivation is used for establishment on slopes equal to or greater than 25%
  3. tracks and roads are established away from natural drainage features and areas that are subject to erosion and landslips.

AO2.2

Any part of a track or road established and maintained as part of the forest for wood production is appropriately drained and adopts the following measures:

  1. establish and maintain a stable surface
  2. drain the track or road with crossfall drainage (preferably with a slope greater than 4 per cent) or by shaping the track or road to a crown so that water drains to both of its sides
  3. establish and maintain drainage structures to convey water away from the track or road formation (for example, crossdrains, mitre drains, turnouts and diversion drains or relief culverts).

AO2.3

Drainage water from tracks and roads established and maintained as part of the forest for wood production is directed away from exposed soils, unstable areas, and towards undisturbed ground and areas with stable surfaces.

Fire risk

PO3

The risk of fire to adjoining premises and infrastructure is minimised through the provision of firebreaks and fire tracks and roads.

AO3.1

Firebreaks are established and maintained:

  1. between the forest for wood production, adjoining premises and existing infrastructure
  2. at a minimum width from the base of the outside trees in accordance with Table 9.2.2.3.3—Forestry for wood production firebreak distances
  3. that are free of flammable material that is greater than 1m high
  4. to be accessible and trafficable for fire suppression vehicles.

AO3.2

Fire access tracks and roads are established and maintained:

  1. to a minimum width of 4m
  2. that are accessible
  3. that ensure no part of a plantation is more than 250m from a fire access track or road.
For assessable development
Cropping harvest, haulage and wildfire management

PO4

The local government is informed of the expected cropping harvest cycles, volumes, timescales and haulage routes, plus propose wildfire management and location of supportive infrastructure.

AO4

When the forest for wood production area is greater than 10ha a management report is attached to the development application that contains the following information:

  1. expected harvest cycles and estimated harvest timescale
  2. an estimated haulage route plan identifying likely local roads for transporting the harvest to the primary destination/s
  3. proposed methods and supporting infrastructure location for managing wild fire (including an area map of the property location, adjacent roads and tracks, property entrances, location of fire access tracks and turnarounds on the property and location of water points in the area).

Table 9.2.2.3.2—Forestry for wood production setback distances
Aspect Distance (measured from the base of the tree)
Areas of environmental interest
Top of a defining bank of streams (gully, creek or river) that are represented on the 1:100 000 topographic map series in accordance with the stream order classification system.
  1. Stream order 1 to 2: 5m, or
  2. Stream order 3 to 5: 10m, or
  3. Stream order 6: 20m.
State–owned protected areas and forest reserves under the Nature Conservation Act 1992. 10m
Protected vegetation under the Vegetation Management Act 1999. 10m

Infrastructure

Dwellings 100m or such distance that ensures the dwelling is consistent with the requirements of AS3959–2009 and the National Construction Code.
Machinery sheds 25m or 1.5 times the maximum anticipated height of the tree at harvest, whichever is the greater.
Transmission lines and above–ground pipelines (excluding infrastructure servicing only the farm) not subject to an easement. 25m or 1.5 times the maximum anticipated height of the tree at harvest, whichever is the greater.


Table 9.2.2.3.3—Forestry for wood production firebreak distances

Aspect Distance
Firebreaks
Forestry for wood production activities less than 40ha. 7m
Forestry for wood production of 40ha to 100ha. 10m
Forestry for wood production greater than 100ha. 20m or a 10m break that is free of flammable material that is greater than 1m high followed by a 10m fuel reduction area where forestry for wood production trees are pruned up to a minimum height of 5m, commencing once trees are greater than 10m in height.

 

9.2.3 Reconfiguring a lot (subdividing one lot into two lots) and associated operational works

  1. The purpose of the reconfiguring a lot (subdividing one lot into two lots) and associated operational works code is for assessing requests for compliance assessment for development for reconfiguring a lot that requires compliance assessment as prescribed in Part 5, section 5.4 under Table 5.4.2—Prescribed level of assessment: reconfiguring a lot.

Note—Development subject to compliance assessment must be able to achieve compliance with the compliance outcomes for a compliance permit to be issued.

Note—If compliance with the code is not possible, the development cannot be considered for compliance assessment and a development application for assessable development must be made to the local government as outlined in Schedule 18 of the Regulation.

Table 9.2.3.1—Reconfiguring a lot (subdividing one lot into two lots) and associated operational works requiring compliance assessment
Compliance outcomes (CO)
Lot design
CO1 Each lot is to comply with the frontage requirements of the relevant zone code where applicable and Reconfiguring a lot code where applicable
CO2 There are no building envelope requirements for reconfiguring a lot (subdividing one lot into two lots) and associated operational work.
CO3 No rear lots are created.
CO4 The reconfiguration ensures that any existing buildings and structures are set back to any new property boundary in accordance with boundary setback requirements under the relevant zone code, where applicable.
CO5

The reconfiguration enables any proposed buildings and structures to comply with boundary setback requirements under the relevant zone code.

OR

In relation to a reconfiguration in a residential zone, where no boundary setbacks are prescribed by the relevant zone code, the reconfiguration ensures that any proposed buildings and structures can comply with boundary setback requirements under the Queensland Development Code.

CO6 The reconfiguration enables proposed buildings and structures to avoid easements, such as easements for trunk sewer lines. No new lots are created where proposed buildings and structures cannot be constructed due to existing or planned underground or above ground infrastructure.
CO7 No new lots are created on land identified as erosion prone, medium storm tide inundation zone or high storm tide inundation zone on the Coastal hazard overlay map. No new lots are created on land identified as a flood hazard area on the Flood hazard overlay map.
CO8 No new lots are created on land identified within a medium, high or very high bushfire hazard area on the Bushfire hazard overlay map.
CO9 No new lots are created where the existing slope of the land is 15% or greater.

Infrastructure

CO10 For premises located in a reticulated water area, each lot is connected to the reticulated water supply system.
CO11

For premises located in a sewered area [1], each lot is connected to the sewerage service.

or

For premises located outside a sewered area, each lot provides for an effluent treatment and disposal system in accordance with the Development design code.

CO12 Each lot is connected to an electricity supply network in accordance with the Development design code.
CO13 Each lot is connected to a telecommunications network in accordance with the Development design code.
CO14 Infrastructure (water supply, sewerage, roads, stormwater quality and quantity, recreational parks, land only for community purposes) is designed and constructed to service the lots in accordance with the Development design code.

Access

CO15 Each lot has lawful, safe and practical access to the existing road network via direct road frontage.
CO16 A driveway crossover to each lot is designed and constructed in accordance with the Development design code.

Stormwater

CO17 Onsite erosion and the release of sediment or sediment–laden stormwater from the premises is minimised at all times including during construction and complies with the Development design code.
CO18 Filling or excavation on the premises does not exceed a maximum of 1m vertical change in natural ground level at any point.
CO19 Filling or excavation does not cause ponding on the premises or adjoining land in accordance with the Development design code.

 

[1] Sewered area is defined in the Plumbing and Drainage Act 2002 and means a service area for a sewerage service under the Water Supply (Safety and Reliability) Act 2008.

Online Mapping

Version 1 - Superseded Planning Scheme

SELECT
  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions Open
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments

Gladstone Regional Council

Connect. Innovate. Diversify.

Return to top

Get in Touch

Phone

(07) 4970 0700

Opening Hours

8.30am - 5pm Monday to Friday

Social media

Contact Us  Email Us

Postal Address

PO Box 29, Gladstone Qld 4680

Council Offices

101 Goondoon Street, Gladstone Qld 4680
3 Don Cameron Drive, Calliope Qld 4680
41 Blomfield Street, Miriam Vale Qld 4677
Cnr Wyndham & Hayes Avenues, Boyne Island Qld 4680

Rural Transaction Centres

71 Springs Road, Agnes Water Qld 4677
47 Raglan Street, Mount Larcom Qld 4695

Footer Image Links

Gladstone Regional Council Logor Gladstone Entertainment Convention Centre Logo Gladstone Regional Art Gallery and Museum Logo Gladstone Regional Libraries Logo Gladstone Tondoon Botanic Gardens Logo Philip Street Communities and Families Precinct

Footer Acknowledgement

Gladstone Regional Council would like to acknowledge the Bailai, the Gurang, the Gooreng Gooreng and the Taribelang Bunda people who are the traditional custodians of this land. Gladstone Regional Council would also like to pay respect to Elders both past, present and emerging, and extend that respect to other Aboriginal and Torres Strait Islander people. Learn more about Council's Reconciliation Action Plan (RAP).

Chat Popup

Launch Chat

© 2025 Gladstone Regional Council

All content © Gladstone Regional Council Planning Scheme. All Rights Reserved.

Powered by Jadu Central.

  • Privacy
  • Right to Information
  • Login
Back to the top
Print footer