• Skip to content
  • Skip to navigation
Print header
X

  • (07) 4970 0700
  • Online Services

«Back to
Gladstone Regional Council

Version 1 - Superseded Planning Scheme

  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments
Version 1 - Superseded Planning Scheme
  1. Home
  2. Version 1 - Superseded Planning Scheme
  3. Part 4 Local Government Infrastructure Plan (LGIP)
  4. 4.2 Planning assumptions
  5. 4.2.8 Extrinsic material
Back
Online Mapping

4.2.8 Extrinsic material

The documents identified in table 4.2.8.1 which assist in the interpretation of the Local Government Infrastructure Plan, are extrinsic material under the Statutory Instruments Act 1992.

Table 4.2.8.1—Extrinsic material to Local Government Infrastructure Plan
Trunk infrastructure network Title of document
Growth projections, planning assumptions and PIA (for all networks)
  • ABS, Catalogue 2004.0 and 2001.0 – 2006 Community Profile Series
  • Edge Town Planning, "Gladstone Rural Living Strategy", Sept 2012
  • Foresight Partners Pty Ltd, "Retail and Commercial Strategy – 2012 Update", July 2012
  • Foresight Partners, "Recommended locations for 1. A second Bulky Goods Retail Centre; and 2. An Automotive retail and services precinct within the Gladstone Region", October 2013
  • SGS Economics and Planning, "Gladstone Region Industrial Land Strategy", July 2012
  • SGS Economics and Planning, "Housing Needs Strategy", October 2010
  • SGS Economics and Planning, "Planning Scheme Analysis", 2012
  • Buckley Van, "Housing Needs Strategy", March 2013
  • Yurrah, "Landscape Assessment and Building Height Strategy", July 2011
  • Buckley Van, "Gladstone Urban Design and Strategy", May 2012 
  • GCC, 2004. Kirkwood Road South Structure Plan 
  • Buckley Vann, Gladstone Regional Council, Social Infrastructure Plan, June 2010
Water supply
  • Gladstone Regional Council  Engineering Standards for Water 
  • KBR, 2004, "Water and Wastewater Planning Studies 2030: Water Supply Report"
  • Councils SAMP/TMP for the provision of water services
Sewerage
  • KBR, 2004, "Water and Wastewater Planning Studies 2030: Wastewater Final Report"
  • Councils SAMP/TMP for the provision of water services
  • Gladstone Regional Council Engineering Standards for Sewerage
Stormwater
  • GHD, Auckland Creek Flood Study
Transport
  • Roads and Transport Standards 2005
Public parks and land for community facilities
  • Ross Planning, "Gladstone City Open Space and Recreation Plan", 2006
Other
  • DIP, LGIP Calculator, Version 11 (2011)
  • Statutory Guideline 01/11 – Priority Infrastructure Plans, Nov 2011
  • OESR, Queensland Regional Profiles, Gladstone City, 2014
  • Adopted Infrastructure Charges Resolution (No. 2) – 2011
Online Mapping

Version 1 - Superseded Planning Scheme

SELECT
  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments

Gladstone Regional Council

Connect. Innovate. Diversify.

Return to top

Get in Touch

Phone

(07) 4970 0700

Opening Hours

8.30am - 5pm Monday to Friday

Social media

Contact Us  Email Us

Postal Address

PO Box 29, Gladstone Qld 4680

Council Offices

101 Goondoon Street, Gladstone Qld 4680
3 Don Cameron Drive, Calliope Qld 4680
41 Blomfield Street, Miriam Vale Qld 4677
Cnr Wyndham & Hayes Avenues, Boyne Island Qld 4680

Rural Transaction Centres

71 Springs Road, Agnes Water Qld 4677
47 Raglan Street, Mount Larcom Qld 4695

Footer Image Links

Gladstone Regional Council Logor Gladstone Entertainment Convention Centre Logo Gladstone Regional Art Gallery and Museum Logo Gladstone Regional Libraries Logo Gladstone Tondoon Botanic Gardens Logo Philip Street Communities and Families Precinct

Footer Acknowledgement

Gladstone Regional Council would like to acknowledge the Bailai, the Gurang, the Gooreng Gooreng and the Taribelang Bunda people who are the traditional custodians of this land. Gladstone Regional Council would also like to pay respect to Elders both past, present and emerging, and extend that respect to other Aboriginal and Torres Strait Islander people. Learn more about Council's Reconciliation Action Plan (RAP).

Chat Popup

Launch Chat

© 2025 Gladstone Regional Council

All content © Gladstone Regional Council Planning Scheme. All Rights Reserved.

Powered by Jadu Central.

  • Privacy
  • Right to Information
  • Login
Back to the top
Print footer