• Skip to content
  • Skip to navigation
Print header
X

  • (07) 4970 0700
  • Online Services

«Back to
Gladstone Regional Council

Version 1 - Superseded Planning Scheme

  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments
Version 1 - Superseded Planning Scheme
  1. Home
  2. Version 1 - Superseded Planning Scheme
  3. Part 4 Local Government Infrastructure Plan (LGIP)
  4. 4.2 Planning assumptions
  5. ​​4.2.2 Population and employment growth
Back
Online Mapping

​​4.2.2 Population and employment growth

A summary of the assumptions about population and employment growth for the planning scheme area is stated in Table 4.2.2.1.

Table 4.2.2.1—Population and employment assumptions summary
Column 1
Description
Column 2
Assumptions
  Base date 2011 2016 2021 2026 2031
Population No 59,461 70,098 83,424 96,107 108,582
% change   17.9% 19% 15.2% 13%
Employment No 15,933 18,147 20,478 23,360 25,965
% Change   13.9% 12.8% 14.1% 11.2%

Source: OESR SA_2 projections (March 2014) 

Detailed assumptions about growth for each projection area and LGIP development type category are identified in the following tables in Schedule 3 Local government infrastructure plan mapping and tables:

  1. For population, Table SC3.1.1—Existing and projected population
  2. For employment, Table SC3.1.2—Existing and projected employees

4.2.2.1 Future development

The developable area is identified on Local Government Infrastructure Plan Maps SC3.1–3.4 in Schedule SC3—Local government infrastructure plan maps.

The planned density for future development is stated in Table SC3.1.3 – Planned density in Schedule SC3.1—Planning assumption tables.

A summary of the assumptions about future residential and non-residential development for the planning scheme area is stated in Table 4.2.2.2—Residential dwellings & non-residential floor space assumptions summary.

Table 4.2.2.2—Residential dwellings and non-residential floor space assumptions summary
Column 1
Description
Column 2
Assumptions
  Base date 2011 2016 2021 2026 2031
Residential dwellings ​ No of 25,155 30,057 36,136 42,169 47,519
% Change   19.5% 20.2% 16.7% 12.7%
Non-residential floor space (m2 GFA) ​ No of 1,590,350 1,722,383 1,849,263 2,083,487 2,175,583
% change   11.5% 7.4% 12.7% 4.4%

Source: OESR SA_2 projections (March 2014) 

Detailed assumptions about future development for each projection area and LGIP development type are identified in the following tables in Schedule SC1 Local government infrastructure plan mapping and tables:

  1. For residential development, Table SC3.1.5—Existing and projected residential dwellings.
  2. For non-residential development, Table SC3.1.6—Existing and projected non-residential floor space.

4.2.2.2 Infrastructure demand

The demand generation rate for a trunk infrastructure network is stated in Schedule SC3—Planning assumption tables.

A summary of the projected infrastructure demand for each service catchment is stated in:

  1. for the water supply network, Table SC3.1.7—Existing and projected demand for the water supply network.
  2. for the sewerage network,  Table SC3.1.8—Existing and projected demand for the sewerage network .
  3. for the transport network,  Table SC3.1.9—Existing and projected demand for the transport network , and
  4. for the parks and land for community facilities network,  Table SC3.1.10—Existing and projected demand for the parks and land for community facilities network .
Online Mapping

Version 1 - Superseded Planning Scheme

SELECT
  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes Open
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments

Gladstone Regional Council

Connect. Innovate. Diversify.

Return to top

Get in Touch

Phone

(07) 4970 0700

Opening Hours

8.30am - 5pm Monday to Friday

Social media

Contact Us  Email Us

Postal Address

PO Box 29, Gladstone Qld 4680

Council Offices

101 Goondoon Street, Gladstone Qld 4680
3 Don Cameron Drive, Calliope Qld 4680
41 Blomfield Street, Miriam Vale Qld 4677
Cnr Wyndham & Hayes Avenues, Boyne Island Qld 4680

Rural Transaction Centres

71 Springs Road, Agnes Water Qld 4677
47 Raglan Street, Mount Larcom Qld 4695

Footer Image Links

Gladstone Regional Council Logor Gladstone Entertainment Convention Centre Logo Gladstone Regional Art Gallery and Museum Logo Gladstone Regional Libraries Logo Gladstone Tondoon Botanic Gardens Logo Philip Street Communities and Families Precinct

Footer Acknowledgement

Gladstone Regional Council would like to acknowledge the Bailai, the Gurang, the Gooreng Gooreng and the Taribelang Bunda people who are the traditional custodians of this land. Gladstone Regional Council would also like to pay respect to Elders both past, present and emerging, and extend that respect to other Aboriginal and Torres Strait Islander people. Learn more about Council's Reconciliation Action Plan (RAP).

Chat Popup

Launch Chat

© 2025 Gladstone Regional Council

All content © Gladstone Regional Council Planning Scheme. All Rights Reserved.

Powered by Jadu Central.

  • Privacy
  • Right to Information
  • Login
Back to the top
Print footer