• Skip to content
  • Skip to navigation
Print header
X

  • (07) 4970 0700
  • Online Services

«Back to
Gladstone Regional Council

Version 1 - Superseded Planning Scheme

  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions Open
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments
Version 1 - Superseded Planning Scheme
  1. Home
  2. Version 1 - Superseded Planning Scheme
  3. Part 8 Overlays
  4. 8.2 Overlay codes
  5. 8.2.4 Bushfire hazard
Back
Online Mapping

8.2.4 Bushfire hazard

8.2.4.1 Application

This code applies to development where the code is identified as applicable in the table of assessment for the bushfire hazard overlay code. When using this code, reference should be made to section 5.3.2 and where applicable, section 5.3.3 located in Part 5.

8.2.4.2 Purpose

  1. The purpose of the bushfire hazard overlay code is to ensure that:

    Note—Relationship with the building assessment provisions. For the building assessment provisions, the bushfire prone area defined by this planning scheme under map is also designated to be the bushfire prone area for the BCA or QDC pursuant to section 12 of the Building Regulation 2006.

    1. The risks to life, property, community, economic activity and the environment during uncontrolled bushfire events are minimised.
    2. Development does not increase the potential for bushfire damage or risk on–site or to other property.
  2. The purpose of the code will be achieved through the following overall outcomes:
    1. Development is compatible with the nature of the bushfire hazard except where there is an overriding need for the development in the public interest and no other site is suitable and reasonably available for the proposal.
    2. Development siting, layout, design and access minimises the risks to personal safety, and damage to property, infrastructure and other assets.
    3. Development directly, indirectly and cumulatively avoids an unacceptable increase in severity of bushfires and does not increase the potential for damage on the site or to other properties.
    4. The potential for the release of hazardous material as a result of a bushfire event is avoided.
    5. Evacuation and disaster management response including firefighting and access for emergency services during bushfire events is facilitated.
    6. Community infrastructure is located and designed to function effectively at all times.

8.2.4.3 Assessment criteria

Table 8.2.4.3.1—Development outcomes for self–assessable and assessable development

Performance outcomes Acceptable outcomes
Site suitability ​

PO1

Development maintains the safety of people and property by not exposing them to an unacceptable risk from bushfire.

Note—A site specific bushfire hazard assessment may demonstrate that the site is not within a bushfire hazard area or has a low degree of bushfire risk.

No acceptable outcome is nominated.

PO2

Development does not result in a higher concentration of people living, working or congregating in a high or very high bushfire hazard area unless it can be demonstrated:

  1. there is an overriding community need in the public interest, and
  2. no other site is suitable and reasonably available.

Note—A 'medium, high or very high bushfire risk hazard area' means land mapped on the bushfire overlay map as having medium, high or very high potential bushfire risk.

AO2

The following uses are not located on land within a confirmed medium, high or very high bushfire hazard area:

  1. child care facility
  2. community care centre
  3. educational establishment
  4. hostel
  5. hospital
  6. multiple dwelling
  7. non–resident workforce accommodation
  8. residential care facility
  9. retirement facility
  10. shopping centre
  11. short–term accommodation
  12. tourist attraction
  13. tourist park.
Water supply

PO3

Development in areas with a reticulated water supply has adequate flow and pressure for fire–fighting purposes at all times.

AO3

The water supply network has a minimum sustained pressure and flow of at least 10L per second at 200kPa.

PO4

Development in areas without a reticulated water supply has an appropriate dedicated water supply for fire–fighting purposes that are safely located and freely accessible for fire–fighting purposes at all times.

​

AO4.1

Development involving a gross floor area greater than 50m2 where a reticulated water supply is not available is:

  1. provided with an easily accessible fire resistant on–site water storage of not less than 5,000L (e.g. concrete tank with fire brigade fittings, in–ground swimming pool, dam fed by a permanent water source) that is within 100m of each class 1, 2, 3, or 4 building, and
  2. has a hard standing area allowing a heavy rigid fire appliance safe access to within 6m of the storage facility.

Note—Plastic water tanks are not considered to be fire resistant unless they are submerged.

AO4.2

The location of water supplies is readily identifiable from the street frontage with clear signage directing firefighters to its access point.

Roads, fire access trails and firebreaks ​

PO5

Roads and fire access trails are designed and constructed to:

  1. enable efficient access to buildings and structures for fire–fighting purposes for emergency services, and
  2. swift evacuation in emergency situations.
​ ​

AO5.1

Roads and fire access trails are designed and constructed to:

  1. separate the development from the hazardous vegetation
  2. have a maximum gradient of 12.5%
  3. a minimum cleared width of 6m and a minimum formed width of 4m
  4. have adequate drainage and erosion control devices
  5. provides passing and turning areas for fire–fighting appliances at intervals of not less than 200m
  6. have a vehicular access at each end to roads or a bushfire trail
  7. not involve any cul–de–sac
  8. have gates locked with a system authorised by QFES, and
  9. have suitable arrangements in place to ensure maintenance in perpetuity.

AO5.2

Development has direct access to an evacuation route with a potential fire intensity exposure no greater than 2kw/m2.

Note—The distance from hazardous vegetation to achieve 2kw/m2 is generally:

  • 58m in a very high bushfire hazard areas
  • 52m in a high bushfire hazard area, and
  • 44m in a medium bushfire hazard area.

AO5.3

Development incorporates an area of managed vegetation that separates lot boundaries from hazardous vegetation by a distance of:

  1. 20m to a high or very high bushfire risk area, or
  2. 10m to a medium risk bushfire area and includes a fire access trail.

PO6

Development provides for adequate fire breaks that minimise bushfire hazard by:

  1. separating hazardous vegetation from development areas, and
  2. facilitating access for firefighting and emergency vehicles.
No acceptable outcome is nominated.
Hazardous materials ​

PO7

The potential for the release of hazardous materials as a result of a bushfire event is avoided.

Note—The term 'hazardous material' is defined in the Glossary of the relevant State Planning Policy.

AO7

Development involving the production or storage of hazardous materials in bulk:

  1. is not located within a high or very high bushfire hazard area, or
  2. complies with a site specific bushfire management plan
Reconfiguration of a lot ​

PO8

Additional lots avoid the risk of bushfire hazard to personal and property safety and increased risk of damage to assets.

Note—A site specific bushfire hazard assessment may demonstrate that the site is not within a bushfire hazard area or has a low degree of bushfire risk. Any site specific bushfire assessment should be carried out in accordance with the method set out in Appendix 3 of State Planning Policy 1/03 Guideline Mitigating the adverse impacts of Flood, Bushfire and Landslide.

AO8

New residential lots (including rear lots) do not occur in a bushfire hazard area.

Community infrastructure ​

PO9

Development for community infrastructure is located, designed and sited to:

  1. protect the safety of people during a bushfire
  2. not increase the exposure of people to the risk from a bushfire event, and
  3. function effectively during and immediately after bushfire events.
No acceptable outcome is nominated.
Online Mapping

Version 1 - Superseded Planning Scheme

SELECT
  • Citation and commencement
  • Part 1 About the planning scheme
      BackPart 1 About the planning scheme
    • 1.1 Introduction
    • 1.2 Planning scheme components
    • 1.3 Interpretation
    • 1.4 Categories of development
    • 1.5 Hierarchy of assessment criteria
    • 1.6 Building work regulated under the planning scheme
    • 1.7 Local government administrative matters
  • Part 2 State planning provisions
      BackPart 2 State planning provisions
    • 2.1 State planning policy
    • 2.2 Regional plan
    • 2.3 Referral agency delegations
    • 2.4 Standard planning scheme provisions
  • Part 3 Strategic framework
      BackPart 3 Strategic framework
    • 3.1 Preliminary
    • 3.2 Strategic intent Open
        Back3.2 Strategic intent
      • The Gladstone Region Places Model
    • 3.3 Gateway to the world
    • 3.4 Community living
    • 3.5 Connecting our places
    • 3.6 Building it better: our urban areas
    • 3.7 Our environment and heritage
    • 3.8 Our rural and coastal townships and places
  • Part 4 Local Government Infrastructure Plan (LGIP)
      BackPart 4 Local Government Infrastructure Plan (LGIP)
    • 4.1 Preliminary Open
        Back4.1 Preliminary
      • 4.1.1 Introduction
      • 4.1.2 Purpose
      • 4.1.3 Structure of Local Government Infrastructure Plan
    • 4.2 Planning assumptions Open
        Back4.2 Planning assumptions
      • 4.2.1 Purpose
      • 4.2.2 Population and employment growth
      • 4.2.3 Infrastructure areas
      • 4.2.4 Desired standards of service
      • 4.2.5 Plans for trunk infrastructure
      • 4.2.7 Schedules of works
      • 4.2.8 Extrinsic material
  • Part 5 Tables of assessment
      BackPart 5 Tables of assessment
    • 5.1 Preliminary
    • 5.2 Reading the tables
    • 5.3 Levels of assessment
    • 5.4 Prescribed levels of assessment
    • 5.5 Levels of assessment—Material change of use Open
        Back5.5 Levels of assessment—Material change of use
      • 5.5.1 Low density residential zone
      • 5.5.2 Low-medium density residential zone
      • 5.5.3 Medium density residential zone
      • 5.5.4 Character residential zone
      • 5.5.5 Emerging community zone
      • 5.5.6 Mixed use zone
      • 5.5.7 Centre zone
      • 5.5.8 Principal centre zone
      • 5.5.9 Neighbourhood centre zone
      • 5.5.10 Specialised centre zone
      • 5.5.11 Low impact industry zone
      • 5.5.12 Medium impact industry zone
      • 5.5.13 Special industry zone
      • 5.5.14 Industry investigation zone
      • 5.5.15 Special purpose zone
      • 5.5.16 Rural zone
      • 5.5.17 Rural residential zone
      • 5.5.18 Township zone
      • 5.5.19 Major tourism zone
      • 5.5.20 Minor tourism zone
      • 5.5.21 Community facilities zone
      • 5.5.22 Sport and recreation zone
      • 5.5.23 Open space zone
      • 5.5.24 Environmental management zone
      • 5.5.25 Conservation zone
      • 5.5.26 Limited development zone (constrained land)
    • 5.6 Levels of assessment: Reconfiguring a lot
    • 5.7 Levels of assessment: Building work
    • 5.8 Levels of assessment: Operational work
    • 5.9 Levels of assessment: Local plans
    • 5.10 Levels of assessment: Overlays
  • Part 6 Zones
      BackPart 6 Zones
    • 6.2 Zone codes Open
        Back6.2 Zone codes
      • 6.2.1 Low density residential
      • 6.2.2 Low-medium density residential
      • 6.2.3 Medium density residential
      • 6.2.4 Character residential
      • 6.2.5 Centre
      • 6.2.6 Principal centre
      • 6.2.7 Neighbourhood centre
      • 6.2.8 Sport and recreation
      • 6.2.9 Open space
      • 6.2.10 Environmental management
      • 6.2.11 Conservation
      • 6.2.12 Low impact industry
      • 6.2.13 Medium impact industry
      • 6.2.14 Special industry
      • 6.2.15 Industry investigation
      • 6.2.16 Major tourism
      • 6.2.17 Minor tourism
      • 6.2.18 Community facilities
      • 6.2.19 Emerging community
      • 6.2.20 Limited development
      • 6.2.21 Mixed use
      • 6.2.22 Rural
      • 6.2.23 Rural residential
      • 6.2.24 Special purpose
      • 6.2.25 Specialised centre
      • 6.2.26 Township
  • Part 7 Local plans
  • Part 8 Overlays
      BackPart 8 Overlays
    • 8.2 Overlay codes
        Back8.2 Overlay codes
      • 8.2.1 Acid sulfate soils
      • 8.2.2 Airport environs
      • 8.2.3 Biodiversity
      • 8.2.4 Bushfire hazard
      • 8.2.5 Coastal hazard
      • 8.2.6 Extractive resources and minerals
      • 8.2.7 Flood hazard
      • 8.2.8 Hazardous activities
      • 8.2.9 Heritage
      • 8.2.10 Regional infrastructure
      • 8.2.11 Scenic amenity
      • 8.2.12 Steep land
      • 8.2.13 Water resource catchment
  • Part 9 Development codes
      BackPart 9 Development codes
    • 9.2 Statewide codes
    • 9.3 Use codes Open
        Back9.3 Use codes
      • 9.3.1 Development design
      • 9.3.2 Extractive industry
      • 9.3.3 Home based business
      • 9.3.4 Landscaping
      • 9.3.5 Operational works
      • 9.3.6 Reconfiguring a lot
      • 9.3.7 Telecommunications facility use
  • Part 10 Other plans
  • Schedule 1 Definitions
      BackSchedule 1 Definitions
    • SC1.1 Use definitions Open
        BackSC1.1 Use definitions
      • SC1.1.1 Defined activity groups
      • SC1.1.2 Industry thresholds
      • Table Sc1.1.1—Index of use definitions
    • SC1.2 Administrative definitions
  • Schedule 2 Mapping
  • Schedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
      BackSchedule 3 Local Government Infrastructure Plan (LGIP) mapping and tables
    • SC3.1 Planning assumptions tables
    • SC3.2 Schedules of works
    • SC3.3 Local government infrastructure plan maps
    • SC3.4 Glossary and abbreviations
  • Schedule 4 Notations required under the Sustainable Planning Act 2009
  • Schedule 5 Land designated for community infrastructure
  • Schedule 6 Planning scheme policies
      BackSchedule 6 Planning scheme policies
    • SC6.1 Planning scheme policy index
    • SC6.2 Engineering design
    • SC6.3 Flood hazard
    • SC6.4 Heritage
    • SC6.5 Non–resident workers accommodation
    • SC6.6 Vehicle parking rates
    • SC6.7 Waste management
  • Appendices​
      BackAppendices​
    • Appendix 1 - Index and glossary of abbreviations and acronyms
    • Appendix 2 - Table of amendments

Gladstone Regional Council

Connect. Innovate. Diversify.

Return to top

Get in Touch

Phone

(07) 4970 0700

Opening Hours

8.30am - 5pm Monday to Friday

Social media

Contact Us  Email Us

Postal Address

PO Box 29, Gladstone Qld 4680

Council Offices

101 Goondoon Street, Gladstone Qld 4680
3 Don Cameron Drive, Calliope Qld 4680
41 Blomfield Street, Miriam Vale Qld 4677
Cnr Wyndham & Hayes Avenues, Boyne Island Qld 4680

Rural Transaction Centres

71 Springs Road, Agnes Water Qld 4677
47 Raglan Street, Mount Larcom Qld 4695

Footer Image Links

Gladstone Regional Council Logor Gladstone Entertainment Convention Centre Logo Gladstone Regional Art Gallery and Museum Logo Gladstone Regional Libraries Logo Gladstone Tondoon Botanic Gardens Logo Philip Street Communities and Families Precinct

Footer Acknowledgement

Gladstone Regional Council would like to acknowledge the Bailai, the Gurang, the Gooreng Gooreng and the Taribelang Bunda people who are the traditional custodians of this land. Gladstone Regional Council would also like to pay respect to Elders both past, present and emerging, and extend that respect to other Aboriginal and Torres Strait Islander people. Learn more about Council's Reconciliation Action Plan (RAP).

Chat Popup

Launch Chat

© 2025 Gladstone Regional Council

All content © Gladstone Regional Council Planning Scheme. All Rights Reserved.

Powered by Jadu Central.

  • Privacy
  • Right to Information
  • Login
Back to the top
Print footer